
ABOUT US
Bi Directional Test Consult Sdn. Bhd. is a CIDB registered professional owned company that provides specialized foundation testing services for the construction industry. The Company operation is led by a specialist in foundation testing and supported by a team of professionals and qualified engineers whom have years of experience in the foundation testing services.
OUR SERVICES





OUR HISTORY
2011
The company was established in the matured industrial township of Subang Jaya neighbouring several MNC like Faber-Castell, Behn Meyer.
2012
Participated in pile testings for Light Rail Transit (LRT) extension project (Ampang Line).
2012
Our first ever bi-directional load test was completed for a condominium project at Bandar Sunway in Petaling Jaya.
2012
Our biggest bi-directional test thus far for a Ø2,200mm bored pile (6,650 tonnes) with a depth of bored 77m was completed for a 55 storey residential tower at KLCC.
2013
Participated in pile testings for Mass Rapid Transit (MRT) Line 1 project.
2013
We expanded our reach to overseas project in Indonesia and Cambodia. The same year also saw us completed our first oversea bi-directional test in Phnom Penh, Cambodia.
2013
We completed yet another biggest bi-directional test in 2013 for a Ø2,200mm bored pile (9,800 tonnes) for a office tower project in Petaling Jaya.
2014
We completed our first bi-directional test for a Ø1,200mm caisson pile for a hotel tower project at Jalan Sultan Ismail, KL.
2014
This year saw our accumulative bi-directional test load exceeded 100,000 tonne since our inception.
2015
This year mark our first foray into Kota Kinabalu, Sabah with two bi-directional load tests completed.
2016
Our first bi-directional test for a single pile with test load higher than 10,000 tonne was completed for a hotel tower project at Jalan Sultan Ismail, KL.
2017
Our first bi-directional load test for a barrette pile completed for Mass Rapid Transit (MRT) Line 2 underground station project at Titiwangsa, KL.
2017
This year also mark our biggest bi-directional load test thus far for a Ø3,000mm bored pile (14,120 tonnes) completed for a mixed development project at Damansara Heights, KL.
2018
Our biggest East Malaysia bi-directional test to date. Ø2,000mm bored pile (7,095 tonnes) completed for a mixed development project at Jalan Wawasan, Kota Kinabalu, Sabah.
2018
We exceeded accumulative 500,000 tonne bi-directional test load since our inception.
2019
Participated in pile testings for Light Rail Transit (LRT) Line 3 project.
2020
Participated in pile testings for Pan Borneo Highway at Sabah
OUR PROJECTS
A picture gallery highlighting some of the notable projects we have completed over the years.
OUR PROJECTS
A picture gallery highlighting some of the notable projects we have completed over the years.